A fence or gate job runs in a set order: talk, look, measure, write it down, then build. Knowing that order lets you plan around the work, get the yard ready and ask the right questions before anything is ordered.

The Call, the Walk and the Written Plan

It starts when you call or send a message about what you have in mind, whether that’s a new backyard fence or a gate that won’t latch. A short description is enough at this point: what you want built or fixed, roughly where, and anything you already know about the yard.

Then Darius Bailey, the owner, comes out to the property. The visit means walking the fence line from end to end, taking measurements and talking through materials and layout with you: where the line runs, where gates go and which way they open, and which material suits the ground and the way you use the yard.

After the visit, the plan and the estimate come to you in writing. Read them through and ask about anything that isn’t clear. Once you approve them, a start date gets set and the materials the job needs are ordered.

The Order of the Work

Jobs differ in size, but on most fence and gate work the steps line up the same way:

  1. First call. You describe the job, and a visit gets set up.
  2. Site visit. The fence line is walked and measured, and materials and layout are talked through on the spot.
  3. Written plan and estimate. The scope and the estimate on paper, for you to read and approve.
  4. Scheduling. After your approval, a start date is set and the materials are ordered.
  5. Utility marking. Buried lines get marked before any hole is dug.
  6. Work days. On jobs like these, any old fence comes out first, then the posts go in, followed by rails, pickets, fabric or panels, and the gates.
  7. A final look along the line. On most jobs the last step is a walk along the finished fence together, checking the posts, the gates and the latches.

How many work days a job takes depends on the length of the line, the ground and the weather, so no two jobs run to quite the same count.

Getting the Yard Ready for a Visit

The fence line has to be seen and measured from one end to the other, so a little preparation makes the visit go further. Before the owner arrives:

  • Think about what the fence or gate has to do: keep a dog in, block a view, close off a driveway or simply mark the line.
  • Decide where you walk through and where vehicles, mowers or trailers need to pass.
  • Look for a property survey or the plat in your closing papers, if you have one.
  • If something is already damaged, take photos first. What to photograph depends on the problem.
  • Note soft or wet spots, big roots and slopes along the line you have in mind.
  • Write your questions down so none get forgotten during the walk.

Visit-Prep Checklist

Tick each job as it’s done, then check the list to see what’s left.

Before the site visit

Tick what’s done first

Marking Buried Lines Before Digging

Every fence post and gate post goes in a hole, and a single hole can hit a gas line, a power cable or a fiber line a short way down. Across the country, dialing 811 starts a locate request: the utilities are told about the digging and send people to mark their lines with paint or small flags. The request goes in ahead of the digging, usually a couple of working days ahead, so it fits between scheduling and the first work day.

The marks follow a color code used nationwide: red for electric power, yellow for gas, orange for phone, cable and internet lines, blue for drinking water and green for sewer. White paint or flags sometimes show where the digging itself is planned. Leave the marks alone until the posts are in.

Those marks cover the lines the utilities own, usually up to the meter. Lines you own past the meter, such as sprinkler pipes, landscape lighting wire, a feed to a detached shop or a gas line to an outdoor grill, are usually not marked. If you know where yours run, point them out during the visit.

The digging itself varies across the area. In the hills toward Harker Heights and Nolanville, limestone can sit a short way under the yard, and a post hole there takes more work and more time than one in deep soil.

Work Days on a Fence or Gate Job

On most fence jobs, the first work day is the loudest. Post holes get dug with an auger, posts get set and checked plumb, and concrete goes in around them. The concrete gets time to firm up before heavy gates hang from their posts.

Newly built cedar privacy fence along the side yard of a limestone and brick ranch house

Once the posts are set, the work above ground moves faster: rails, then pickets on a wood fence, fabric stretched along a chain-link line, or panels fastened up on ornamental iron. Gates go in once their posts are ready, latches follow, and a powered gate gets its opener last. Expect saws, nail guns and a truck or trailer close to the work.

By the end, the posts should stand straight, the gates should swing clear and latch without a push, and nothing should be left loose. The final walk along the line is the moment to point out anything that doesn’t look right to you.

Home, Weather and Neighbors During the Work

Does someone have to be home on the work days?

Not always. On many fence jobs, once the layout is settled, the work can go ahead with nobody home, as long as the yard can be reached. Being home helps with locked gates and pets, and with any choice that comes up partway through, such as a big root right where a post belongs. Say what suits you when the start date is set.

What happens to the schedule when it rains?

Rain usually moves the work rather than stopping a job for long. Killeen-area clay turns to sticky mud when it’s soaked, and digging and setting posts in it makes a mess of the holes and the yard, so that part generally waits for the ground to firm up. A hard freeze can hold up concrete work too, since fresh concrete shouldn’t freeze before it sets.

Will the work bother the neighbors?

Expect some noise on digging days and a truck or trailer parked nearby. A fence on a shared line also has to be reached from both faces to be built straight and fastened well, so the work touches both yards for a while. Dogs next door may bark at the activity for a day or two.

Can I still use the yard while the fence goes up?

Mostly, away from the line itself. Open holes, fresh concrete and stacked material are the hazards, so keep children and pets clear of the work area until the holes are filled and the posts are set. A gate may be off its hinges for part of a day, which matters if the yard is the only place the dog can be.

Questions to Ask Any Contractor

Whoever builds your fence or hangs your gate, these questions make two plans easier to compare and leave fewer surprises once the work starts.

Topics to raise with any fence or gate contractor and why each one matters
TopicWhy It Matters
What the estimate coversTwo estimates can describe two different jobs. Check the length of the run, the height, the materials, the number of gates and whether taking out an old fence is included.
Post depth and spacingPosts carry the whole fence. Ask how deep they go, how far apart they stand and how they’re set in the ground.
Materials and hardwareThe wood’s grade, the type of post, the gauge of chain-link wire and the hinges and latches all decide how long the fence holds up.
Utility markingAsk who places the locate request and when digging can start once the marks are down.
Start date and lengthA start date and a rough count of work days let you plan pets, cars and your own days around the job.
Changes partway throughIf you add a gate or move a corner after approval, the change belongs in writing like the rest of the plan.
Payment timingKnow when payment is due, and how, before the first post goes in.
The finished lineAgree on what done looks like: posts plumb, tops level or stepped cleanly on a slope, gates that latch on their own.

The Next Step Is a Walk of the Line

Call with what you have in mind, and the first step is a visit to walk and measure. Nothing moves ahead until you’ve read the written plan and approved it.